Projects



 

Pool-bridge for the Langnese Summer-Club 2004

The bridge consists of 206 different joints and 220 rods. Each rod and joint was individually manufactured and afterwards put together like a puzzle. Intentionally the looks of the bridge bear a certain randomness, this is, however, the result of strict precise system technology.

(Click on the pictures to enlarge them)

Span length: 14m
Load capacity: 15t on a area of 30 m2
Site: Isla Cristina, Spain
Construction time: 14 days with 3 men
Architect:
Christoph Tönges

 

The prefabricated parts are assembled at the construction site.

 

The finished girders are placed above the pool with a crane.

 

The proud architect and his building.




More pictures:

foundation and  beamnode detail

 

 

 